Chernobyl, Ukraine - Walking tour of territory Chernobyl Nuclear Power Plant
Open in PlaceTube Watch on YouTube
Places in this video
- Chernobyl Nuclear Power Plant ▶ 1:15
The main destination of the tour: the presenter walks around the plant, explaining the history of power units No. 1 to No. 4, the 1986 accident and the plant's 22 years of operation.
- New Safe Confinement ▶ 4:03
The huge iron arch over power unit No. 4, built from 2007 to 2016 to replace the collapsing Sarcophagus; the presenter explains its 100-year service life and the dismantling work planned until 2064.
- Power unit No. 5 and No. 6 construction site ▶ 4:23
The presenter points out the cranes of power unit No. 5, which was about 90% ready when construction was halted on May 27, 1987, along with the planned unit No. 6.
- Water supply channel ▶ 4:58
A channel built to supply the power plant with cooling water, shown as the group drives through the territory.
- Monument to the liquidators of the Chernobyl accident ▶ 9:25
A monument to the perished liquidators near the plant, where the presenter also notes the Prometheus statue moved here from Pripyat to protect it from looters.
- Prometheus statue ▶ 9:25
Originally installed in Pripyat in front of the cinema, the statue was transferred to the power plant territory to protect it from marauders.
- Chernobyl Nuclear Power Plant canteen ▶ 19:02
The group stops for lunch in the plant's canteen, which the presenter praises as excellent and shows on camera.