Unfinished power units No. 5 and No. 6
Chernobyl, Ukraine · Videos: 1 · Map (Approximate location)
What travel creators say
The presenter points out the cranes of power unit No. 5, which was about 90% ready when construction was halted on May 27, 1987, along with the planned unit No. 6.