Ondangwa Market Tensions and Digital Hubs
Open in PlaceTube Watch on YouTube
Places in this video
- Ondangwa ▶ 0:01
The presenter describes Ondangwa as the gateway to the north, a dusty trade and warehousing hub in the Oshana region that feels like it is holding its breath for the first rains.
- Omadela Open Market ▶ 2:20
The council says there are still free stalls at the Omadela Open Market, while vendors complain there is no room there and that being pushed off the roadsides is harassment.
- Standard Bank Oluno ▶ 2:32
The presenter walks past the Standard Bank branch in Oluno, a building that recalls the South African Defence Force staging post once operated here during the border war.
- Cafe Mocca ▶ 2:47
A small spot near the bus terminal where locals take a break from work; the cappuccino costs about 35 Namibian dollars and the presenter sits outside watching the town go by.
- Ondangwa Open Market ▶ 4:05
A labyrinth of covered and open stalls selling hats, dried meat, hand-woven baskets and bright fabrics; the presenter buys bread and milk for about 47 Namibian dollars total.
- Ondangwa Digital Technology Hub and Conferencing Center ▶ 4:58
The upgraded Rossing Foundation center, opened in June, houses an 800 square meter hall with 73 interactive science models covering electricity to astronomy; the presenter spends an hour exploring the air-conditioned exhibits.
- Oluno Secondary School ▶ 6:01
The old Andimba Toivo ya Toivo Secondary School is being rebuilt as Oluno Secondary School under a 50 million Namibian dollar contract, creating 50 to 70 temporary jobs.
- Bank Windhoek ▶ 6:49
The presenter visits the only wholly Namibian-owned major bank to discuss FICA requirements and non-resident accounts for expats.
- Nakambale Museum ▶ 7:58
A cultural landmark in Olukonda preserving Ovambo heritage; the presenter takes a taxi there but turns back because of the heat and saves it for a cooler day.
- King Kauluma Gardens ▶ 8:14
A new planned low-cost residential development, a public-private partnership of about 494 units on 24.9 hectares, still under construction as Ondangwa's answer to its housing shortage.