The presenter walks along the edge of Uhuru Park, showing the new pedestrian walkway capacity enhancement and the cobblestone works being laid around the park.
- Nyayo House ▶ 0:12
Nyayo House is pointed out as a landmark near the road works, and later the presenter shows people walking to work past it.
- Green Park Underpass ▶ 0:58
The presenter notes the Green Park underpass is reportedly 99% done and shows excavation and landscaping work connecting from Green Park Terminus.
- Green Park Terminus ▶ 1:24
The presenter mentions drainage excavation connecting from Green Park Terminus as part of the underpass works.
- Haile Selassie Exit ▶ 2:45
The presenter shows the Haile Selassie exit where vehicles leave the Nairobi Expressway into the CBD, with landscaping and ground works underway.
- Upper Hill ▶ 3:43
The presenter points out the morning sun illuminating the sides of Upper Hill, a Nairobi neighborhood of high-rise development.
- Uhuru Highway ▶ 4:35
The presenter walks along Uhuru Highway, showing the expressway exit, drainage concerns, and the pedestrian walkway works along the road.
- Kilimani ▶ 5:31
Kilimani is cited as an example of the vertical developments and high-rise infrastructure spreading across the city.
- Kileleshwa ▶ 5:31
Kileleshwa is mentioned alongside Kilimani as an area of rapid vertical development in Nairobi.
- Hazina Towers ▶ 9:52
The presenter refers to the other side of Uhuru Highway near Hazina Towers, where similar capacity enhancement work is ongoing.
- Central Park ▶ 11:42
Central Park is mentioned when comparing drainage covers along the walkway, noting that side of the park was not covered.
- Kenyatta Avenue ▶ 14:17
The presenter notes soil in the median of Kenyatta Avenue at Uhuru Highway and later links the traffic build-up to the Kenyatta Avenue viaduct construction.
- NSSF Twin Towers ▶ 14:32
The presenter describes the NSSF Twin Towers under construction, with Tower A at 260 m and 60 floors including a 56th-floor observation deck, and Tower B at 140 m.
- Kenyatta Avenue Viaduct ▶ 17:23
The presenter shows the ongoing Kenyatta Avenue viaduct construction, with beams being laid and traffic build-up caused by the works.
- All Saints Cathedral ▶ 19:48
The presenter films the viaduct construction at the All Saints Cathedral area, showing the metal works and crane setting bases for the next pillar.