MASSIVE Cleanup: Nairobi’s $400M River Regeneration Reality Check Pt2
Open in PlaceTube Watch on YouTube
Places in this video
- Upper Hill ▶ 2:44
The presenter walks through Upper Hill, pointing out the Social Security Fund building and the area's new condominiums and towers.
- Kenyatta Avenue ▶ 3:00
He notes that part of Kenyatta Avenue heading toward Valley Road will be closed for eight months for bridge construction.
- Ngong Road ▶ 4:09
The presenter introduces the segment while standing on Ngong Road, framing the Nairobi River regeneration project.
- Bishop Road ▶ 8:08
He walks along Bishop Road in Upper Hill, showing the new cabro paving and greenery along the path.
- Lucky Summer ▶ 14:51
The presenter calls Lucky Summer ground zero for the 80 billion shilling river regeneration, walking the riverbanks and discussing rents and safety with a local.
- Nairobi Dam ▶ 27:00
The presenter points out the Nairobi Dam area where two rivers meet and separate, with controlled burning visible nearby.
- Dandora Wastewater Treatment Plant ▶ 37:27
He explains that the new twin trunk sewer lines will channel raw sewage to the expanded Dandora wastewater treatment plant before it reaches the river.
- Nairobi River ▶ 43:38
The video follows the Nairobi River through Lucky Summer, showing cleanup work, sewer separation and the ambitious regeneration master plan.
- Haile Selassie Avenue ▶ 47:37
Local guide Moses says his IT business, Matrix Telematics, is on the sixth floor of Coffee Plaza on Haile Selassie Avenue.