$1.4B Rironi Mau Summit Update | 540 Days, 233KM Extreme Terrain
Open in PlaceTube Watch on YouTube
Places in this video
- Rironi ▶ 2:03
The presenter says the expressway starts at Rironi, where the highway will be expanded into a dual four-lane carriageway.
- Naivasha ▶ 2:03
The corridor runs from Naivasha to Gilgil, and from Naivasha to Nakuru West it widens into a dual six-lane expressway.
- Nakuru ▶ 2:31
Through Nakuru town a new viaduct lifts traffic above the city's most congested sections, and the presenter calls it a custom-built Nairobi Expressway for Nakuru.
- Mau Summit ▶ 2:37
Beyond Nakuru to Mau Summit the road continues as a dual four-lane carriageway, completing the high-capacity route.
- Gilgil ▶ 3:15
Gilgil is the split point between the two phases, with CRBC taking phase one from Rironi and Shandong Highspeed taking phase two onward.
- Nakuru Viaduct ▶ 4:20
The presenter describes the epic 4.5 km elevated viaduct built straight over Nakuru's major roundabouts to avoid demolishing thousands of businesses.
- Mau Mau Escarpment ▶ 14:51
The A8 South branch through Mau Mau faces extreme terrain, steep gradients and loose volcanic soil, requiring climbing lanes, tunnels and reinforced bridges.
- Kinungi ▶ 17:49
The presenter mentions the notorious fog at Kinungi, where contractors are installing high-mast lighting and intelligent transport systems.
- Kikopey ▶ 17:49
Kikopey is named alongside Kinungi as a fog-prone spot on the escarpment where new lighting and transport systems are being installed.
- Kariandusi Prehistoric Site ▶ 18:56
The presenter says vibration-dampening technology is being used near the Kariandusi prehistoric site to protect Kenya's archaeological treasures.
- Hyrax Hill ▶ 18:56
Hyrax Hill is mentioned with Kariandusi as an archaeological treasure the project is taking steps to protect.
Cities in these videos
Rironi · Naivasha · Nakuru · Mau Summit · Gilgil