Flash Vertical Velocity | Construction Update #5 | Six Flags Great Adventure | May 3rd, 2024
Open in PlaceTube Watch on YouTube
Places in this video
- Six Flags Great Adventure ▶ 0:01
Alex is back at the park for construction update number five of The Flash Vertical Velocity, filming from the entrance plaza and midway.
- The Flash: Vertical Velocity ▶ 0:01
The new coaster under construction; Alex shows the immelmann taking shape, the vertical spike at 90 degrees, the storage track with drive tires, and the future fully covered station.
- Dream Street ▶ 1:11
Alex walks Dream Street to view the footers and construction, noting catwalks and handrails being installed and the valley evacuation points on the railings.
- Showcase Theater ▶ 2:03
Alex notes there's something going on at the Showcase Theater today — it's physics day and the park is full of kids.
- Main Street ▶ 3:21
Alex highlights the sight lines of The Flash from Main Street and shows the new lion statue recreating the park's original entrance lion.
- Battle for Metropolis ▶ 4:04
Alex films the construction view from Battle for Metropolis, showing the track caps at the end of the rails and the large span of the immelmann.