Sutro Tunnel
Virginia City, United States · Videos: 2 · Map
Historic site
What travel creators say
Adolph Sutro's 4-mile drainage bore, which took nearly a decade and was finished just as the richest ores ran out.
Adolph Sutro's 4-mile drainage tunnel, completed in 1878 at a cost of $6.5 million, drained scalding water from the lower mines but came too late to save them.