Bicaz Dam
Bicaz, Romania · Videos: 2 · Map
Dam in Neamț County, Romania
Dimitrie Leonida (Stejaru) Hydro Power Plant is a hydropower development on the Bistrița River, near Bicaz, Romania. The project was started and finished in the 1950s. It consists of a dam, a reservoir, and a hydro power plant. The dam is a reinforced concrete structure with a height of 127 metres. It formed and holds the Bicaz Lake reservoir, also known as Mountain Spring Lake ("Lacul Izvorul Muntelui"). The reservoir is the largest artificial lake in Romania; it manages river levels downstream, provides fishing, attracts tourism, fuels the power plant, and controls flooding. The Oak…
What travel creators say
The largest structure of its kind in Romania, built in the 1950s, 127 m high and over 400 m long; the presenter notes photography and drones are restricted on the bridge itself.
From videos in other languages
Barajul Lacului Bicaz, văzut de pe DN15 la capătul Axialului, pe malul opus estic al lacului.