Bamboo Bridge
Kampong Cham, Cambodia · Videos: 2 · Map (Approximate location)
What travel creators say
The seasonal bamboo bridge to Koh Paen is rebuilt every dry season from December to June; in early November the crossing is still closed.
They cycle across the bamboo bridge, rebuilt every dry season after the wet season washes it away; it costs about $1 each for a person plus a bicycle, and palapas with hammocks await on the far side.