PlaceTubeThe places in YouTube travel videos, on a map

Capanda Dam

Malanje, Angola · Videos: 1 · Map

Capanda Dam
· CC BY-SA 3.0 · Wikimedia Commons

Dam in Malanje, Angola

The Capanda Dam is a hydroelectric dam on the Kwanza River in Malanje Province, Angola. Built in 1987–2007 by the Russian company Tekhnopromexport, general designer - the institute Hydroproject (Chief Engineer - Ph.D Fedosov V.E.) The facility generates power by utilizing four turbines and 130 megawatts each, totalling the installed capacity to 520 megawatts. Total cost of US$4 billion. An additional cost of more than US$400 million was spent in repairing the damage caused during UNITA's occupation of the area at the time of the Angolan Civil War in 1992 and 1999.

From Wikipedia · CC BY-SA 4.0

What travel creators say